ISS generates required Spare Part / Industrial Material (IM) list(s) from the Electrical and Mechanical Bill of Materials (BOM).

We are familiar with the most automotive manufacture’s Spare Part / Industrial Material (IM) required deliverable templates. 

Scroll to Top